

Mining
INT’L STANDARD PORTALS
- Implementing Australian mining methods and regulations
- As advised by our competent Australian Consultant, Htongyi Portal is designated as the main portal for mining ore production which will eventually connect to the other 2 main vein and their adits.
- Currently Main Portal reaches 4 vertical levels and total main drive reaches 1030 meters
- Main Portal 2 main drive reaches 420 meters
- A competent team of Technical Experts from PT Antam (Indonesia) managed the Mining Operations For a year from 1st October 2014 to 31st October 2015.
- Dr. Burkhard Eisenlohr, our Chief Geologist has introduced Micromine and is being used for all geological and mining related tasks.
